Decking on the 2nd floor on both houses |
One of the center fire walls going up on Thrivent side |
Monday
04/15
It's up. But it makes me kind of sad we can't see our fellow volunteers on the other side. :( |
WB outer side wall framed & ready for sheathing |
Getting everyone on the same page before we lift this wall |
It's up! |
Each bay (the space between each stud) is nailed to the 2nd floor decking |
Nailing the sheathing from both the 1st & 2nd floors to the rim board that's between the two floors |
By end of day WB has an outer side wall up |
Thrivent house has their center fire wall up & just need to sheath their side outer wall before it goes up |
A lovely sunny day to work outside! |
More Spring! |
Tuesday
04/16
Nailing insulation to sheetrock on the first of two WB house firewalls |
Lift it into place |
Keep a hold on it until the braces are in place. And voila! You have a wall! :) |
An insulation outline is nailed to our second firewall |
Up it goes! |
This crazy tree has both pink & white blossoms |
Bill, Mike & Ri Len are either strategizing our next step on the build or just shooting the breeze in the sunshine. Hmmm... |
Time for the back wall |
End of day WB |
End of day Thrivent |
Thrivent house |
Wednesday 04/17
Interior walls need to get up as Mike is having our roof trusses show up on Thursday, a day early. Yikes! |
End of day WB |
End of day Thrivent |
Honestly, we won't leave these out on the sidewalk. Tomorrow they'll fly :) |